Regional compute campus
Data CentersScene reference

Regional compute campus

Location
Johor, Malaysia
Business line
Data Centers
Application
Integrated site
Delivery form
20 MW phased build
01Requirement

What the site needed

Capacity had to come online in blocks while the permanent building was still under construction.

A phased cabin campus with shared power and cooling plant.

02Configuration

Unit list

Reference quantities. Final scope follows the approved project schedule.

UnitQtyNote
40ft compute cabin82.4 MW reference each
Power cabin3MV/LV and battery
CDU and dry cooler4Closed loop, N+1
Service cabin1Control and workshop
03Delivery

Delivery notes

01

Block planning

Cabin positions reserved for later phases.

02

Shared interfaces

Power and cooling branches isolated per block.

03

Integrated test

Full load test across compute and cooling.