Modular HousingScene reference
Workforce camp, northern Canada
- Location
- Alberta, Canada
- Business line
- Modular Housing
- Application
- Engineering camp
- Delivery form
- 120 expandable units
01Requirement
What the site needed
The camp operates through winter at a site without municipal services. Units had to arrive complete, connect to a temporary generator plant and be relocatable when the program moved.
Winterised sleeping and welfare blocks for a remote infrastructure program.
02Configuration
Unit list
Reference quantities. Final scope follows the approved project schedule.
| Unit | Qty | Note |
|---|---|---|
| Sleeping block | 80 | Four occupants, winter package |
| Ablution module | 24 | Prefabricated wet pods |
| Mess and office | 16 | 40ft open plan |
03Delivery
Delivery notes
01
Winter envelope
Extra insulation and heated wet areas tested before dispatch.
02
Site assembly
Crane-set blocks on compacted pads, connected in two weeks.
03
Relocation plan
Bolted connections and lifting frames reused between phases.
04Site gallery
Images
Discuss a similar project
Send the site and the requirement. We will propose the unit mix.