Insights
Modular building insightsAug 22, 20265 min read

Five lines an EPC team should add to a camp specification

Small wording changes in a camp specification prevent most rework on site.

This technical note is summarised here. The full text, with configuration tables and references, is available from our engineering team on request.

Reference note · Final configuration subject to project design

Have a technical question?

Our engineering team can review the site conditions and the intended configuration.